
Meanwhile, the Minister for Power and Renewable Energy- Ranjith Siyambalapitiya has also ordered to submit an internal and external report to him about the sudden power failure.
Ministry sources claim that an internal committee comprising Ceylon Electricity Board officials and an external committee with technical experts will be appointed to look into the matter and submit relevant reports.
The islandwide blackout was a result of a technical error in the high voltage power line between Laxapana power station and Kolonnawa via Polpitiya, Upapola, told the CEB.